The Grand - Clitheroe

Commissioned to carry out a pilot scheme at The Grand - Clitheroe.

 

Initial 3D concept work Initial 3D concept work Initial 3D concept work Initial 3D concept work Initial 3D concept work Initial 3D concept work Initial 3D concept work Initial 3D concept work Initial 3D concept work 3Initial 3D concept work Initial renovation work carried out on the Grand Initial renovation work carried out on the Grand Initial renovation work carried out on the Grand Initial renovation work carried out on the Grand Initial renovation work carried out on the Grand Initial renovation work carried out on the Grand

 

Part of a design team commissioned to carried out a feasibility study on a cinema / live venue due for a renovation.
  • Working with both the client and architect to carry out minimal refurbishments to a 400 seat working cinema.
  • Overseeing the renovations and acting as the clients on site representative for the duration of the project.
  • Full design and overseeing installation of a temporary audio system.
  • Full design and overseeing installation of a temporary lighting system.
  • Full design and installation of a temporary video system.
  • Overseeing all Audio / Visual / Lighting / IT systems / Building installation and training.
  • Training of sound / lighting and video engineers.